Id | Region | Right# | Type | Stage |
Date Created |
Organization | ||
---|---|---|---|---|---|---|---|---|
Wolverine Low Impact Surveys | ||||||||
Ulukhaktok | Mining Exploration | Close Out | 2023-02-10 | Jason Abplanalp | BHP Mineral Resources (on behalf of Rio Algom Exploration) | |||
Wolverine Low Impact Surveys | ||||||||
Ulukhaktok | Airstrips | Close Out | 2023-02-10 | Jason Abplanalp | BHP Mineral Resources (on behalf of Rio Algom Exploration) | |||
Tuk Base Remediation | ||||||||
Tuktoyaktuk | ILA19TS018 | Soil Testing - Geotechnical | Inspection | 2022-11-16 | Stacey Hunchak | Imperial Oil Resources Limited c/o Canacre (Pauline Pangilinan) | ||
2020 Tuktoyaktuk Road Elevation Project | ||||||||
Tuktoyaktuk | ILA20TQ013 | Quarrying | Inspection | 2020-07-06 | Max Stuckey | Hamlet of Tuktoyaktuk | ||
South Tuktoyaktuk Feasibility Study – Geotechnical Investigation | ||||||||
Tuktoyaktuk | ILA20TS004 | Soil Testing - Geotechnical | Inspection | 2020-01-21 | Alan R MacDonald | ESG Management Consultants | ||
Hamlet road and Beneficiary Gravel requirements | ||||||||
Tuktoyaktuk | ILA19TQ017 | Quarrying | Inspection | 2019-03-21 | 2019-09-30 | Shawn Stuckey Hamlet Of Tuktoyaktuk | Shawn Stuckey Hamlet Of Tuktoyaktuk | |
Ikhil I-37 | ||||||||
Aklavik | ILA16IS016 | Soil Testing - Geotechnical | Inspection | 2016-06-10 | 2016-09-13 | Jeff Powers | Hobbit Environmental Consulting | |
BAR-C Tununuk Point | ||||||||
Aklavik | ILA15IQ009 | Quarrying | Inspection | 2015-04-07 | 2015-09-30 | Masten Brolsma | Masten Brolsma | |
Development of Inuvik to Tuktoyaktuk Highway Borrow Source 174 | ||||||||
Sachs Harbour | ILA14TQ024 | Quarrying | Inspection | 2014-11-10 | 2016-04-15 | Colleen Riches | Colleen Riches | |
Inuvik Tuktoyaktuk Highway: Borrow Source I401A All-season Access Road Construction and Operation | ||||||||
Aklavik | ILA14IF019 | Roads - Public Construction | Inspection | 2014-08-14 | 2015-04-30 | Colleen Riches | Colleen Riches |